Real homes, real progress

Every job is different, but the care we put in is the same. Here are some of our latest, including one we filmed on site from start to finish.

BirminghamCompleted October 2026

Rear extension & open-plan knock-through

A dark, closed-off back of the house, turned into one big, bright open-plan space. We took out the old walls on new steels, built a flat-roof extension with a roof lantern and bi-fold doors, then laid underfloor heating and large porcelain tiles right through.

What we did

  • Wall removal & steels
  • New flat roof & roof lantern
  • Bi-fold doors
  • Underfloor heating
  • Self-levelling & tiling
Ask about something similar on WhatsApp
The old kitchen before work started: dark wood units and brown wall tiles
Before
After

Where we started

The before photos

This is what the house looked like when we started.

  • The old kitchen before work started: dark wood units and brown wall tiles
  • Another view of the old kitchen, with the ceiling already opened up
  • Early strip-out: ceiling down and props ready for the steels
  • The room next door stripped back, with props ready to support the new beam

Step by step

How it came together

From the first plan to the finished room, filmed on site as the work went on. No staging, just the job as it was.

  1. 1

    Planning

    The plan

    It started with a plan: a simple 3D walkthrough of the new open-plan layout, so everyone could picture the finished space before a single wall came down.

  2. 2

    Start

    Day one

    Ceilings down, props in. The old back of the house had to go before anything new could go up.

    Strip-out with ceiling joists exposed and acrow props on the floor
  3. 3

    July

    New roof goes on

    Decking down on the new flat roof, with the opening framed ready for the roof lantern.

  4. 4

    July

    Waterproofing

    The roof membrane rolled out and bonded down, nice and tight.

  5. 5

    July

    The bits you never see

    Proper fixings, properly spaced. The hidden work matters as much as the finish.

  6. 6

    August

    Watertight

    Roof finished and sealed, so the inside work could get going whatever the weather.

  7. 7

    September

    Floors ready

    Underfloor heating down, then a self-levelling screed for a perfectly flat base for the tiles.

  8. 8

    October

    Handed over

    Large porcelain tiles down, bi-folds in, and a room full of light.

The result

The finished space

Filmed once the work was complete.

Birmingham

Staircase makeover

Worn carpet and a heavy dark handrail, swapped for warm oak treads and risers, a glass balustrade and soft LED lights under every step. Same staircase, completely different feel.

What we did

  • Oak treads & risers
  • Glass balustrade
  • Oak newel post & handrails
  • LED step lighting
Ask about something similar on WhatsApp
The staircase before: worn brown carpet and a dark wooden wall handrail
Before
The finished staircase: oak treads, a glass balustrade and LED lights under each step
After